Service Details:
Consultancy Service Type | GPCB APPROVED |
Application Area Located At | Urban Area |
Service Type | Hazardous Waste Generator Registration |
Clearance Service Duration | 6 to 9 Months |
Service Location | Gujarat |
Service Mode | Offline |
Service Duration | 1-9 Days |
Other Details:
Service Details:
Minimum Order Quantity | 1 Piece |
Consultancy Service Type | all |
Type | ONSITE |
Coverage Area | 500 to 1000 Square Feet |
Testing Location | INDIA |
Application Area Located At | All |
Mode Of Report | HARD COPY |
Need AMC | YES |
Site Visit Timing | AS PER PLAN |
Service Mode | Offline |
Duration | 2-3 Days |
Location | Gujarat |
Additional Information:
Service Details:
Range | ALL |
Required Standards | NABL |
Calibrated For | services |
Testing Type | NABL |
Service Type | Certificate Provider |
Standard Certificate | NABL |
Usage/Application | Engineering |
Location/City | Pan India |
Mode Of Report | Hard Copy |
Service Mode | Offline |
Service Duration | 3-6 Days |
Service Location | Gujarat |
Service Details:
Minimum Order Quantity | 1 Test |
Testing Type | all |
Test Location | lab |
Analysis Type | Micro Structural Analysis |
Usage/Application | onsite |
Loccation | Gujarat |
Service Mode | onsite |
Service Duration | DAILY |
Additional Information:
Service Details:
Minimum Order Quantity | 1 Test |
Test Location | In Laboratory |
Test Product | Water |
Mode Of Report | Hard Copy |
Place Of Testing | In Laboratory |
Usage/Application | Industrial |
Type Of Testing | nabl |
Duration | 2-6 Days |
Service Mode | Offline |
Service Location | Gujarat |
Environmental tests are used to verify a piece of equipment can withstand the rigors of harsh environments, for example:
Service Details:
Range | ALL |
Required Standards | NABL |
Location/City | Gujarat |
Instrument Type | Laboratory Instrument |
Industry Type | ALL |
Mode Of Report | Hard Copy |
Number Of Instruments | UNLIMITED |
Calibrated For | Industrial |
Service Mode | Offline |
Service Duration | 3-9 Days |
Service Details:
Minimum Order Quantity | 1 Test |
Type Of Water | NABL |
Chemical Quality Testing | NABL |
Usage/Application | Industrial |
Certifications Required | NABL |
Microbiological Testing Required | Yes |
Also Provides | Water Testing |
Service Mode | Offline |
Service Location | Gujarat |
Duration | 2-7 Days |
Features:
Service Details:
Minimum Order Quantity | 1 Day |
Type Of Energy | Solar |
Usage/Application | Industrial |
Type Of Service Provider | all |
Type Of Load | all |
Reason For Audit | Maintenance Audit |
Mode Of Report | Hard Copy |
Location | Gujarat |
Service Mode | Offline |
Service Duration | 1-3 Days |
Service Details:
Consultancy Service Type | all |
Type | ONSITE |
Coverage Area | AS PER REQ |
Testing Location | INDIA |
Service Locaton | Gujarat |
Service Mode | Offline |
Duration | 2-10 Days |
Service Details:
Minimum Order Quantity | 1 Unit |
Type Of Energy | Solar |
Usage/Application | Industrial |
Type Of Service Provider | all |
Type Of Load | all |
Reason For Audit | Maintenance Audit |
Service Mode | Offline |
Service Duration | 4-10 Days |
Location | Gujarat |
Service Details:
Minimum Order Quantity | 1 Unit |
Service Location | Industrial |
Frequency | Monthly |
Type Of Waste | Non-Biodegradable |
Service Mode | Offline |
Service Duration | 1-8 Days |
Additional Information:
Service Details:
Consultancy Service Type | all |
Type | ONSITE |
Coverage Area | AS PER REQ |
Testing Location | INDIA |
Service Duration | 2 - 3 Week |
Service Mode | Offline |
Service Location | Gujarat |
Service Details:
Service Type | Air Protection |
Mode Of Report | HARD COPY |
Service Mode | Offline |
Service Location | Gujarat |
Service Duration | 4-9 Days |
Applications:
As waste management consultants, we can assist your business with site selection, landfill engineering and design, landfill permitting, and construction of a solid waste management facility. We offer complete environmental and civil engineering services, geologic services, environmental consulting, and construction management services that will take your project to completion.
Air Quality Permitting: Title V air permitting requirements now apply to many MSW landfills. Now new greenhouse gas regulations are being added to the mix for landfills. We can help you sort out what permits are required and get the needed permits.
Service Details:
Minimum Order Quantity | 1 Day |
Type Of Energy | Solar |
Usage/Application | Industrial |
Type Of Service Provider | all |
Type Of Load | all |
Reason For Audit | Maintenance Audit |
Location | Gujarat |
Service Mode | Offline |
Service Duratrion | 1-2 Days |
Service Details:
Type Of Energy | Solar |
Usage/Application | Industrial |
Type Of Service Provider | all |
Reason For Audit | Maintenance Audit |
Service Location | Gujarat |
Service Mode | Offline |
Service Duration | 4-8 Days |
Service Details:
Type Of Energy | Solar |
Usage/Application | Industrial |
Type Of Service Provider | all |
Type Of Load | all |
Reason For Audit | Maintenance Audit |
Mode Of Report | Hard Copy |
Location | Gujarat |
Service Mode | Offline |
Service Duration | 1-4 Days |
Service Details:
Minimum Order Quantity | 1 Day |
Service Type | GPCB APPROVED |
Mode Of Report | HARD COPY |
Location | INDIA |
Service Location | Gujarat |
Service Mode | Offline |
Duration | 3-7 Days |
Environmental noise can also have a range of characteristics Continuous noise:
Intermittent noise:
Additional Information:
Service Details:
Professional Experience Of Service Provider | More than 5 Years |
Project Duration | AS PER REQUIREMENT |
Working Days | AS PER REQUIREMENT |
Temperature | Low temperature |
Flow | High Flow |
Level | High level |
Safety Audit Type | STANDARD |
Location | Gujarat |
Service Mode | Offline |
Service Duration | 2 - 3 Days |
Service Details:
Testing Location | Ahmedabad |
Service Details:
Service Location | Ahmedabad |